top of page

About Me

headshot.PNG

Ryan Kanner is currently a 5th-year Architectural Engineering student at Penn State University. Once graduated, he plans on entering the construction management field and working for a General Contractor or Construction Management company. He already has some experience in the industry after working two summer internships at Holder Construction, with the first being in the Atlanta Preconstruction department and the second in Operations. During these internships, Ryan learned how to perform takeoffs, develop a complete scope of work, write RFI's, review submittals, and produce monthly jobsite cost projections.

 

Besides his coursework, Ryan has been involved with the Penn State Dance Marathon. His activities include membership on a Rules and Regulations committee, as well as acting as a Philanthropy Chair for his fraternity.  Outside of school, Ryan enjoys golf, skiing, and hiking with both friends and family. He is also an avid Penn State football, Pittsburgh Steelers, and Pittsburgh Pirates fan.

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Ryan Kanner. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. 

News Feed

9/4/2018:

CPEP Page is active.

9/10/2018:

CPEP Menu is fully functional.

9/14/2018:

Student Bio Sketch posted on CPEP.

 

10/1/2018:

Building Statistics posted on CPEP.

10/10/2018:

Tech Report 1 posted on CPEP.

10/17/2018:

Building Statistics Part 2 posted on CPEP.

10/26/2018:

Abstract posted on CPEP.

12/5/2018:

Tech Report 2 posted on CPEP.

12/5/2018:

Tech Report 3 posted on CPEP.

12/9/2018:

Initial Proposal posted on CPEP.

1/14/2019:

Final Proposal posted on CPEP.

4/1/2019:

Final Report posted on CPEP.

4/8/2018:

Final Report posted on CPEP.

bottom of page